10 Paket
Paket Terumumkan
Rp. 36.011.907.000,-
Pagu Terumumkan
2 Paket
Paket Selesai
Rp. 510.000.000,-
Pagu Selesai
PAKET TENDER (Paket) |
TENDER SELESAI (Paket) |
TENDER BELUM SELESAI (Paket) |
HPS_PAKET_(RP) | HPS PAKET TENDER SELESAI (RP.) |
NILAI PENAWARAN TERKOREKSI (RP.) |
SELISIH TENDER (Rp.) | PERSENTASE (%) |
---|---|---|---|---|---|---|---|
10 | 2 | 8 | 36.011.907.000,00 | 510.000.000,00 | 452.313.000,00 | 57.687.000,00 | 11,31 |
METODE TENDER | HPS PAKET TENDER SELESAI(RP.) |
NILAI PENAWARAN TERKOREKSI (RP.) |
PAKET TENDER (Paket) | TENDER SELESAI (Paket) |
TENDER BELUM SELESAI (Paket) |
---|---|---|---|---|---|
TENDER | 0 | 0 | 6 | 0 | 6 |
TENDER CEPAT | 0 | 0 | 0 | 0 | 0 |
SELEKSI | 510.000.000,00 | 452.313.000,00 | 4 | 2 | 2 |
TOTAL | 510.000.000,00 | 452.313.000,00 | 10 | 2 | 8 |
JENIS | HPS PAKET TENDER SELESAI(RP.) | NILAI PENAWARAN TERKOREKSI (RP.) | PAKET TENDER (Paket) | TENDER SELESAI (Paket) | TENDER BELUM SELESAI (Paket) |
---|---|---|---|---|---|
BARANG | 0 | 0 | 0 | 0 | 0 |
KONSTRUKSI | 0 | 0 | 6 | 0 | 6 |
JASA KONSULTANSI | 510.000.000,00 | 452.313.000,00 | 4 | 2 | 2 |
JASA LAINNYA | 0 | 0 | 0 | 0 | 0 |
TOTAL | 510.000.000,00 | 452.313.000,00 | 10 | 2 | 8 |
NO. | NAMA SATUAN KERJA | TENDER | TENDER CEPAT | SELEKSI | TOTAL | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Paket | HPS | PENAWARAN TERKOREKSI | Paket | HPS | PENAWARAN TERKOREKSI | Paket | HPS | PENAWARAN TERKOREKSI | Paket | HPS | PENAWARAN TERKOREKSI | SISA | ||
1. | DINAS PEKERJAAN UMUM PENATAAN RUANG PROVINSI NTB | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 510.000.000 | 452.313.000 | 2 | 510.000.000 | 452.313.000 | 57.687.000 | T O T A L | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 510.000.000 | 452.313.000 | 2 | 510.000.000 | 452.313.000 | 57.687.000 |